DC 24-01 & SP 24-02 Transition Parkway Linear Park
DC 24-01 proposes to change the zoning Tract A of the Transition Parkway Industrial Park subdivision from General Industrial (GI) to Public Facilities (PF).
SP 24-02 proposes a new linear park that will be located between the existing Conser Road and the all new street, Transition Parkway (to be built in tandem with the park). The park will be a passive/active park comprised primarily of landscaping, a 12-foot-wide multi-use path, and sidewalk connections to nearby roadways. The park will include a retaining wall and an 8-foot tall, vegetated berm that will provide a buffer between residentially zoned lands to the north and industrial lands to the south.
The project was approved May 14th by the City Council.